As first shown to the members of the church on March 16, 1902, the parish house would include the following components: • attached to the east side of the chapel • First floor: pastor’s study, primary room, two parlors, cutting room, men’s coat room, toilet rooms • Second floor: large hall with stage and dressing rooms, choir room, kitchen, and store rooms • A porch would serve as a common entrance for both the parish house and the chapel. • The whole structure would have been constructed using brick and stone. The project also included a new heating system for the entire campus. |