The building committee approved the following changes to the plan during construction: • A survey of the property uncovered the need to remove about 2 feet from the north of the building in order to accommodate a driveway. The 2 feet were removed specifically from the lavatory and coat room. • The design of the windows and entrance at the front of the parish house was altered to produce a more pleasing harmony with the design of the church. • Excavations for the foundation revealed underground springs that necessitated the installation of drains both inside and out the new foundation walls. Additional expenses incurred during construction included: • sewer extension • enlarged drains • silver glass • extra coat of roof felt • snow guards • broom closet • extra iron beams • chipped plate glass • ventilator and damper • extra electrical fixtures and work. |